Front Wheel Bearing Hub With Extra Long Lead ABS Sensor for Discovery 2
- SKU:
- TAY100060L
- UPC:
- 5056342718641
- Brand:
- Britpart
- Condition:
- New
- Availability:
- NORMAL STOCK ITEM
- Weight:
- 6.00 KGS
Description
A quality replacement, front wheel hub bearing assembly complete with an ABS sensor with extra long lead.
Land Rover recognised that on some Discovery 2 vehicles, the wiring from the ABS sensor to the ECU could get damaged. This would result in the vehicle recording ABS faults that cannot be corrected by either a sensor or hub replacement. Their solution was to produce a sensor with a very long lead that bypassed the damaged lead. This hub assembly is a complete unit with ABS sensor and lead.
PLACEMENT: Front, left, right
EQUIVALENT TO LAND ROVER PART NUMBER(S): TAY100060
SUITABLE FOR THE FOLLOWING LAND ROVER MODELS:
Discovery 2, 1998-2004, All models, Front, left, right
Warranty Information
Additional Information
Position: |
Front |
Position: |
Left |
Position: |
Right |
Compatible Vehicles: |
Discovery 2 |
Please check or contact us for help or further information if you are unsure of the compatibility with your vehicle. Also, please be aware that if you return items, we may deduct or charge you any delivery costs we have incurred and a restocking fee of up to 15% of the net price of the item(s). Photos are for illustrative purposes only. Brands, colours or quantities may vary.
Have a question or feedback about this product?