Front Wheel Bearing Hub With Extra Long Lead ABS Sensor for Discovery 2

SKU:
TAY100060L
UPC:
5056342718641
Brand:
Britpart
Condition:
New
Availability:
NORMAL STOCK ITEM
Weight:
6.00 KGS
£83.49 Inc. VAT
£69.57 Ex. VAT

Description

A quality replacement, front wheel hub bearing assembly complete with an ABS sensor with extra long lead.

Land Rover recognised that on some Discovery 2 vehicles, the wiring from the ABS sensor to the ECU could get damaged. This would result in the vehicle recording ABS faults that cannot be corrected by either a sensor or hub replacement. Their solution was to produce a sensor with a very long lead that bypassed the damaged lead. This hub assembly is a complete unit with ABS sensor and lead.

PLACEMENT: Front, left, right

EQUIVALENT TO LAND ROVER PART NUMBER(S): TAY100060

SUITABLE FOR THE FOLLOWING LAND ROVER MODELS:
Discovery 2, 1998-2004, All models, Front, left, right

View AllClose

Warranty Information

24 MONTHS - This Britpart product is covered by the manufacturer's standard 24 month warranty against material defects and workmanship.
View AllClose

Additional Information

Related Part Numbers:
TAY100060
Position:
Front
Position:
Left
Position:
Right
Compatible Vehicles:
Discovery 2
View AllClose

Reviews

View AllClose

Please check or contact us for help or further information if you are unsure of the compatibility with your vehicle. Also, please be aware that if you return items, we may deduct or charge you any delivery costs we have incurred and a restocking fee of up to 15% of the net price of the item(s). Photos are for illustrative purposes only. Brands, colours or quantities may vary.

Have a question or feedback about this product?

JGS4x4 is an independent supplier of parts and accessories. We are not affiliated with or endorsed by Jaguar Land Rover Limited. All references to vehicle models are used for identification and compatibility purposes only.