Front Wheel Bearing Hub With Extra Long ABS Sensor Lead for Discovery 2 1998–2004 | TAY100060L

(7 reviews) Write a Review
SKU:
TAY100060L
UPC:
5056342718641
Brand:
Britpart
Condition:
New
Availability:
NORMAL STOCK ITEM
Weight:
6.00 KGS
  • Front wheel bearing hub with long ABS sensor lead for Discovery 2
  • Discovery 2 front hub assembly with extended ABS sensor wiring kit
  • Suitable for Discovery 2 1998 to 2004 front wheel hub
£81.99 Inc. VAT
£68.32 Ex. VAT
Frequently bought together:

Description

If your Discovery 2 is suffering from persistent ABS faults, even after replacing the wheel bearing hub or ABS sensor, the issue is often caused by damaged wiring between the sensor and the ECU.

This upgraded front wheel bearing hub assembly comes complete with an ABS sensor featuring an extra long lead, designed to bypass damaged or degraded wiring and restore a reliable signal to the ABS system.

Land Rover introduced this longer lead design as a solution to common wiring faults, making this an ideal replacement where standard hubs have not resolved ABS warning lights.

KEY FEATURES

  • Front wheel bearing hub assembly with integrated ABS sensor
  • Extra long ABS sensor lead to bypass damaged wiring
  • Direct replacement for standard hub assemblies
  • Helps resolve persistent ABS faults and warning lights
  • Pre-assembled unit for straightforward installation

COMMON FAULTS THIS CAN FIX

  • ABS warning light staying on
  • “Three amigos” fault (ABS, TC and HDC lights)
  • Intermittent ABS sensor signal issues
  • Wiring faults between hub and ECU

PART DETAILS

  • Part number: TAY100060L
  • Equivalent to: TAY100060
  • Position: Front
  • Fits: Left or right side
  • Includes: Hub assembly with ABS sensor and extended lead

SUITABLE FOR THE FOLLOWING LAND ROVER MODELS

  • Discovery 2, 1998–2004, all models, front, left or right

NOTES

  • Torque hub nut to the correct specification during installation
  • Ensure wiring is routed correctly and secured away from moving parts
  • Professional installation recommended if unsure

An effective solution for stubborn ABS faults on Discovery 2 models, combining a complete hub assembly with an extended sensor lead to overcome common wiring issues.

View All Close

Warranty Information

24 MONTHS - This Britpart product is covered by the manufacturer's standard 24 month warranty against material defects and workmanship.
View All Close

Additional Information

Related Part Numbers:
TAY100060
Position:
Front
Position:
Left
Position:
Right
Compatible Vehicles:
Discovery 2
linked_products:
TAY100060K
linked_products:
TAY100060G
linked_products:
TAY100060
View All Close

Reviews

No reviews yet.

View All Close

If you’re unsure whether this part is right for your vehicle or specific requirements, we strongly recommend contacting us before placing your order — we’re happy to help you check compatibility. Please note that returned items may be subject to delivery cost deductions and a restocking fee of up to 15% of the item’s net price. Images are for illustration purposes only; actual brand, colour, or quantity may vary.

Have a question or feedback about this product?

JGS4x4 is an independent supplier of parts and accessories. We are not affiliated with or endorsed by Jaguar Land Rover Limited. All references to vehicle models are used for identification and compatibility purposes only.