Rear Wheel Bearing Hub With Long Lead ABS Sensor for Discovery 2
- SKU:
- TAY100050L
- MPN:
- TAY100050
- Brand:
- Britpart
- Availability:
- ALLOW 1-2 DAYS EXTRA SUBJECT TO AVAILABILITY
- Weight:
- 5.80 KGS
Description
Replacement rear wheel hub bearing assembly complete with ABS sensor with extra long lead.
Land Rover recognised that on some Discovery 2 vehicles the wiring from the ABS sensor to the ECU could get damaged. This would result in the vehicle recording ABS faults that cannot be corrected by either a sensor or hub replacement. Their solution was to produce a sensor with a very long lead that bypassed the damaged lead. This hub assembly is a complete unit with this type of ABS sensor and lead.
(ABS SENSOR LEAD DOES NOT COME WITH PLUG, PLUG FROM OLD SENSOR NEEDS SOLDERING ON TO THE NEW LEAD)
A quality replacement part, equivalent to Land Rover part number TAY100050
Suitable for the following models:
Land Rover: Discovery 2, All models, 1998-2004, REAR
Warranty Information
Additional Information
|
Compatible Vehicles:
|
Discovery 2
|
|
linked_products:
|
TAY100050K
|
|
linked_products:
|
TAY100050GK
|
|
linked_products:
|
TAY100050
|
|
linked_products:
|
TAY100050G
|
If you’re unsure whether this part is right for your vehicle or specific requirements, we strongly recommend contacting us before placing your order — we’re happy to help you check compatibility. Please note that returned items may be subject to delivery cost deductions and a restocking fee of up to 15% of the item’s net price. Images are for illustration purposes only; actual brand, colour, or quantity may vary.
Have a question or feedback about this product?