Front ABS Sensor with Long Lead for Discovery 2 - SSW500020
- SKU:
- SSW500020
- MPN:
- SSW500020
- Brand:
- Direct Replacement
- Availability:
- ALLOW 1-2 DAYS EXTRA
- Weight:
- 0.13 KGS
Description
This front ABS sensor reads the speed of the front wheel and sends the signal to the ABS control unit for anti-lock braking and traction control. It has a long lead with loose wires and is a direct replacement for the Land Rover Discovery 2 (L318).
Key Features
- Front ABS wheel speed sensor
- Long lead with loose wires
- Direct replacement part for the Discovery 2
- Equivalent to Land Rover part number SSW500020
- Backed by a 12 month manufacturer's warranty
Fitment
| Model | Details | Years |
|---|---|---|
| Discovery 2 (L318) | Front, with ABS | 1998-2004 |
What's in the Box
- 1 x front ABS sensor with long lead
Part Number Reference
- Front ABS sensor: equivalent to Land Rover part number SSW500020
- Front ABS sensor: Land Rover engineering number 3H222C570AA
- Front ABS sensor: other makers' cross-reference numbers 30778, AF03275, EPS1153, V48-72-0026, ABS01161
Frequently Asked Questions
Which Land Rover models does it fit?
It fits the Discovery 2 (L318) - Front, with ABS (1998-2004).
Is it a front or rear sensor?
It is a front ABS sensor.
What type of lead does it have?
It has a long lead with loose wires.
Which Land Rover part number does it replace?
It is equivalent to Land Rover part number SSW500020 (engineering number 3H222C570AA).
What does an ABS sensor do?
It reads the speed of the wheel and sends the signal to the ABS control unit for anti-lock braking and traction control.
How many sensors are supplied?
One front sensor is supplied.
Warranty Information
If you’re unsure whether this part is right for your vehicle or specific requirements, we strongly recommend contacting us before placing your order — we’re happy to help you check compatibility. Please note that returned items may be subject to delivery cost deductions and a restocking fee of up to 15% of the item’s net price. Images are for illustration purposes only; actual brand, colour, or quantity may vary.
Have a question or feedback about this product?