Parts and Accessories for Land Rover Vehicles from an Independent UK Supplier

Shop Parts by Vehicle

Choose your vehicle to browse compatible parts and accessories.

Rear Wheel Bearing Hub With Long Lead ABS Sensor for Discovery 2

(No reviews yet) Write a Review
SKU:
TAY100050L
UPC:
5056342718658
Brand:
Britpart
Condition:
New
Availability:
ALLOW 1-2 DAYS EXTRA SUBJECT TO AVAILABILITY
Weight:
5.80 KGS
  • Britpart Rear Wheel Bearing Hub With Long Lead ABS Sensor for Discovery 2, metal wheel hub with integrated ABS sensor and long wiring cable.
  • Britpart Rear Wheel Bearing Hub With Long Lead ABS Sensor for Discovery 2, metal wheel hub with integrated ABS sensor and long wiring cable.
£82.99 Inc. VAT
£69.16 Ex. VAT
Frequently bought together:

Description

Replacement rear wheel hub bearing assembly complete with ABS sensor with extra long lead.

Land Rover recognised that on some Discovery 2 vehicles the wiring from the ABS sensor to the ECU could get damaged. This would result in the vehicle recording ABS faults that cannot be corrected by either a sensor or hub replacement. Their solution was to produce a sensor with a very long lead that bypassed the damaged lead. This hub assembly is a complete unit with this type of ABS sensor and lead.

(ABS SENSOR LEAD DOES NOT COME WITH PLUG, PLUG FROM OLD SENSOR NEEDS SOLDERING ON TO THE NEW LEAD)

A quality replacement part, equivalent to Land Rover part number TAY100050

Suitable for the following models:
Land Rover: Discovery 2, All models, 1998-2004, REAR

View All Close

Warranty Information

24 MONTHS - This Britpart product is covered by the manufacturer's standard 24 month warranty against material defects and workmanship.
View All Close

Additional Information

Compatible Vehicles:
Discovery 2
linked_products:
TAY100050K
linked_products:
TAY100050GK
linked_products:
TAY100050
linked_products:
TAY100050G
View All Close

Reviews

No reviews yet.

View All Close

If you’re unsure whether this part is right for your vehicle or specific requirements, we strongly recommend contacting us before placing your order — we’re happy to help you check compatibility. Please note that returned items may be subject to delivery cost deductions and a restocking fee of up to 15% of the item’s net price. Images are for illustration purposes only; actual brand, colour, or quantity may vary.

Have a question or feedback about this product?


JGS4x4 is an independent supplier of parts and accessories. We are not affiliated with or endorsed by Jaguar Land Rover Limited. All references to vehicle models are used for identification and compatibility purposes only.