Parts and Accessories for Land Rover Vehicles from an Independent UK Supplier

Shop Parts by Vehicle

Choose your vehicle to browse compatible parts and accessories.

Discovery 2 Front ABS Brake Sensor - Long Lead With Loose Wires Autotec

(1 review) Write a Review
SKU:
SSW500020A
MPN:
SSW500020
Brand:
Autotec
Availability:
ALLOW 1-2 DAYS EXTRA
Weight:
0.15 KGS
£43.49 Inc. VAT
Frequently bought together:

Description

Discovery 2 front ABS brake sensor - long lead with loose wires.

SUITABLE FOR THE FOLLOWING LAND ROVER MODELS:
Discovery 2 L318, 1998-2004

EQUIVALENT TO LAND ROVER PART NUMBER(S): SSW500020

NOTE: With ABS

PLACEMENT: Front

ABS sensors are very sensitive, individually monitoring the speed of each wheel through an electromagnetic field generated by the wheel’s rotation. These speed signals are sent to your Land Rover's ECU to control traction and braking by applying the brakes to one or more wheels automatically keeping you and those around you safe. However, due to their closeness to the wheels and the ground, ABS sensors are exposed to constant heat, dirt and moisture, vibrations, and the occasional jolt, leading to malfunctions.

View All Close

Warranty Information

24 MONTHS - This product is covered by the manufacturer's standard 24 month warranty against material defects and workmanship.
View All Close

Additional Information

Related Part Numbers:
SSW500020
Position:
Front
Compatible Vehicles:
Discovery 2
linked_products:
SSW500020
View All Close

Reviews

No reviews yet.

View All Close

If you’re unsure whether this part is right for your vehicle or specific requirements, we strongly recommend contacting us before placing your order — we’re happy to help you check compatibility. Please note that returned items may be subject to delivery cost deductions and a restocking fee of up to 15% of the item’s net price. Images are for illustration purposes only; actual brand, colour, or quantity may vary.

Have a question or feedback about this product?


JGS4x4 is an independent supplier of parts and accessories. We are not affiliated with or endorsed by Jaguar Land Rover Limited. All references to vehicle models are used for identification and compatibility purposes only.