Discovery 2 Rear ABS Brake Sensor - Long Lead With Loose Wires Autotec
- SKU:
- SSW500030A
- MPN:
- SSW500030
- Brand:
- Autotec
- Availability:
- ALLOW 1-2 DAYS EXTRA
- Weight:
- 0.23 KGS
Description
Discovery 2 rear ABS brake sensor - long lead with loose wires.
SUITABLE FOR THE FOLLOWING LAND ROVER MODELS:
Discovery 2 L318, 1998-2004
EQUIVALENT TO LAND ROVER PART NUMBER(S): SSW500030
NOTE: With ABS
PLACEMENT: Rear
ABS sensors are very sensitive, individually monitoring the speed of each wheel through an electromagnetic field generated by the wheel’s rotation. These speed signals are sent to your Land Rover's ECU to control traction and braking by applying the brakes to one or more wheels automatically keeping you and those around you safe. However, due to their closeness to the wheels and the ground, ABS sensors are exposed to constant heat, dirt and moisture, vibrations, and the occasional jolt, leading to malfunctions.
Warranty Information
Additional Information
|
Position:
|
Rear
|
|
Compatible Vehicles:
|
Discovery 2
|
|
linked_products:
|
SSW500030G
|
|
linked_products:
|
SSW500030
|
If you’re unsure whether this part is right for your vehicle or specific requirements, we strongly recommend contacting us before placing your order — we’re happy to help you check compatibility. Please note that returned items may be subject to delivery cost deductions and a restocking fee of up to 15% of the item’s net price. Images are for illustration purposes only; actual brand, colour, or quantity may vary.
Have a question or feedback about this product?