Front Wheel Bearing Hub With Extra Long Lead ABS Sensor for Discovery 2
- SKU:
- TAY100060L
- UPC:
- 5056342718641
- Brand:
- Britpart
- Condition:
- New
- Availability:
- NORMAL STOCK ITEM
- Weight:
- 6.00 KGS
Description
A quality replacement, front wheel hub bearing assembly complete with an ABS sensor with extra long lead.
Land Rover recognised that on some Discovery 2 vehicles, the wiring from the ABS sensor to the ECU could get damaged. This would result in the vehicle recording ABS faults that cannot be corrected by either a sensor or hub replacement. Their solution was to produce a sensor with a very long lead that bypassed the damaged lead. This hub assembly is a complete unit with ABS sensor and lead.
PLACEMENT: Front, left, right
EQUIVALENT TO LAND ROVER PART NUMBER(S): TAY100060
SUITABLE FOR THE FOLLOWING LAND ROVER MODELS:
Discovery 2, 1998-2004, All models, Front, left, right
Warranty Information
Additional Information
|
Position:
|
Front
|
|
Position:
|
Left
|
|
Position:
|
Right
|
|
Compatible Vehicles:
|
Discovery 2
|
|
linked_products:
|
TAY100060K
|
|
linked_products:
|
TAY100060G
|
|
linked_products:
|
TAY100060
|
If you’re unsure whether this part is right for your vehicle or specific requirements, we strongly recommend contacting us before placing your order — we’re happy to help you check compatibility. Please note that returned items may be subject to delivery cost deductions and a restocking fee of up to 15% of the item’s net price. Images are for illustration purposes only; actual brand, colour, or quantity may vary.
Have a question or feedback about this product?