Front Wheel Bearing Hub With Extra Long Lead ABS Sensor for Discovery 2

(7 reviews) Write a Review
SKU:
TAY100060L
UPC:
5056342718641
Brand:
Britpart
Condition:
New
Availability:
NORMAL STOCK ITEM
Weight:
6.00 KGS
  • Britpart Front Wheel Bearing Hub With Extra Long Lead ABS Sensor for Discovery 2, automotive wheel hub with five wheel studs and electronic ABS sensor cable.
  • Britpart Front Wheel Bearing Hub With Extra Long Lead ABS Sensor for Discovery 2, automotive wheel hub with five wheel studs and electronic ABS sensor cable.
  • Suitable for Discovery 2
£81.99 Inc. VAT
£68.32 Ex. VAT

Description

A quality replacement, front wheel hub bearing assembly complete with an ABS sensor with extra long lead.

Land Rover recognised that on some Discovery 2 vehicles, the wiring from the ABS sensor to the ECU could get damaged. This would result in the vehicle recording ABS faults that cannot be corrected by either a sensor or hub replacement. Their solution was to produce a sensor with a very long lead that bypassed the damaged lead. This hub assembly is a complete unit with ABS sensor and lead.

PLACEMENT: Front, left, right

EQUIVALENT TO LAND ROVER PART NUMBER(S): TAY100060

SUITABLE FOR THE FOLLOWING LAND ROVER MODELS:
Discovery 2, 1998-2004, All models, Front, left, right

View All Close

Warranty Information

24 MONTHS - This Britpart product is covered by the manufacturer's standard 24 month warranty against material defects and workmanship.
View All Close

Additional Information

Related Part Numbers:
TAY100060
Position:
Front
Position:
Left
Position:
Right
Compatible Vehicles:
Discovery 2
linked_products:
TAY100060K
linked_products:
TAY100060G
linked_products:
TAY100060
View All Close

Reviews

No reviews yet.

View All Close

If you’re unsure whether this part is right for your vehicle or specific requirements, we strongly recommend contacting us before placing your order — we’re happy to help you check compatibility. Please note that returned items may be subject to delivery cost deductions and a restocking fee of up to 15% of the item’s net price. Images are for illustration purposes only; actual brand, colour, or quantity may vary.

Have a question or feedback about this product?

JGS4x4 is an independent supplier of parts and accessories. We are not affiliated with or endorsed by Jaguar Land Rover Limited. All references to vehicle models are used for identification and compatibility purposes only.